Current Projects
Search all current projects
Assessing Bat Use of Culverts in Virginia and Identifying Opportunities for Streamlining the Consultation Process for VDOT Projects: Phase I Study
128280
May 31, 2026
Investigators: Jonathan Luu, Bridget M. Donaldson
Reflective Crack Mitigation Strategies In Virginia - Performance Review
122357
June 30, 2026
Investigators: Harikrishnan Nair, Ph.D., P.E., M. Shabbir Hossain, Ph.D., P.E.
Test Methods for Joint Fabrics Used in Precast Concrete Adjacent Member Beam Connections
128245
February 28, 2027
Investigators: Bernard L. Kassner, Ph.D., P.E.
Overlays with Rapid Setting Cement and a Liquid Low P Admixture
128209
June 30, 2028
Investigators: H. Celik Ozyildirim, Ph.D., P.E., Mary Sharifi
Ultra-High Performance Concrete Overlays in Virginia
128208
June 30, 2028
Investigators: H. Celik Ozyildirim, Ph.D., P.E., Mary Sharifi
Patch Mixtures for Bridge Structures and Pavements
128207
August 31, 2026
Investigators: H. Celik Ozyildirim, Ph.D., P.E., Mary Sharifi, M. Shabbir Hossain, Ph.D., P.E.
Evaluation of Alternative Materials for Timber Bridge Deck Plank Replacement
128200
January 31, 2028
Investigators: Osman Osbulut, Bernard L. Kassner, Ph.D., P.E., Jason T. Provines, P.E.
Identifying Opportunities to Improve Temporary Sediment Basins
128164
March 31, 2027
Investigators: Lewis N. Lloyd, P.E., Maria Rossetti, Ph.D.
Experimental Approaches for Integrating External Factors into Pathway for Planning (P4P) Traffic Volume Forecasting
126947
March 31, 2027
Investigators: Yiqing Xu, Ph.D.
Last updated: May 6, 2024
