Fatigue Assessment for the Failed Bridge Deck Closure Pour at Mile Marker 43 on I-81
Authors: Elias Rivera, Ebrahim K. Abbas, William J. Wright, Ph.D., P.E., Richard E. Weyers, Ph.D., P.E., C.L. Roberts-Wollmann, Ph.D., P.E.
Corrosion Assessment for the Failed Bridge Deck Closure Pour at Mile Marker 43 on I-81
Authors: Ebrahim K. Abbas, Richard E. Weyers, Ph.D., P.E., William J. Wright, Ph.D., P.E., Carin L. Roberts-Wollmann, Ph.D., P.E.
Development of Safety Performance Functions for Multilane Highway and Freeway Segments Maintained by the Virginia Department of Transportation
Authors: Young-Jun Kweon, Ph.D., P.E., In-Kyu Lim
Determinants of Variability in Preliminary Engineering Funding
Authors: Bethany Turner, John S. Miller, Ph.D., P.E.
Use of Concrete Pavement Overlays on U.S. 58 in Virginia
Authors: Michael M. Sprinkel, P.E., Mohamed K. Elfino, Chung Wu, Affan Habib, H. Celik Ozyildirim, Ph.D., P.E., M. Shabbir Hossain, Ph.D., P.E.
Evaluation of the MMLS3 for Accelerated Wearing of Asphalt Pavement Mixtures
Authors: D. Stephen Lane, Cristian Druta, Linbing Wang