Differential Settlement of a Geosynthetic Reinforced Soil Abutment: Full-Scale Investigation: Summary Report

Report No
15-R4
Publication date
2015

Authors: Andrew Kost, George M. Filz, Ph.D., P.E., Thomas E. Cousins, Ph.D., P.E.

Synthesis of Trenchless Technologies

Report No
15-R16
Publication date
2015

Authors: Lindsay Ivey Burden, Ph.D., Edward J. Hoppe, Ph.D., P.E.

Data Needs Assessment for Making Transportation Decisions in Virginia

Report No
15-R23
Publication date
2015

Authors: Asad J. Khattak, Ph.D., Xin Wang, Ph.D., Sanghoon Son, Ph.D., Jun Liu

Evaluation of a Buried Cable Roadside Animal Detection System

Report No
15-R25
Publication date
2015

Authors: Cristian Druta, Ph.D., Andrew S. Alden, P.E.

Investigation of Panel-to-Panel Connections and Block-outs for Full-Depth Precast Concrete Bridge Decks

Report No
15-R5
Publication date
2015

Authors: Matthew K. Swenty, Thomas E. Cousins, Ph.D., P.E., Carin L. Roberts-Wollmann, Ph.D., P.E.