Skip to main content

Search all reports

A System for Forecasting and Monitoring Cash Flow: Phase I: Forecasting Payments on Construction Contracts

Report No
84-R11
Publication date
1983

Authors: Adele Shapanka, Gary R. Allen, Ph.D.,

Centerline Pavement Markings on Two-lane Mountain Highways: Volume 2

Report No
84-R9
Publication date
1983

Authors: Mitsuru Saito, Nicholas J. Garber, Ph.D.,

Centerline Pavement Markings on Two-lane Mountain Highways: Volume 1

Report No
84-R8
Publication date
1983

Authors: Mitsuru Saito, Nicholas J. Garber, Ph.D.,

Use of Interactive Graphics in Bridge Analysis and Design

Report No
84-R7
Publication date
1983

Authors: Furman W. Barton, Ph.D., H. Celik Ozyildirim, Ph.D., P.E.

Bias of Air Void System Data from Fly Ash Concretes

Report No
84-R6
Publication date
1983

Authors: Hollis N. Walker,

Interim Report: A Non-Overlay Cathodic Protection System

Report No
84-R5
Publication date
1983

Authors: G. G. Clemeña,

Underwater Photography for Bridge Inspections

Report No
84-R3
Publication date
1983

Authors: Daniel D. McGeehan,

Last updated: July 29, 2026

Please note that this file is not ADA compliant. Choose one of below options: