Reports
Search all reports
Laboratory Investigation of Hydrated Lime as an Antistripping Additive: Final Report
Authors: G. W. Maupin, Jr., P.E.
Final Report: Polymer Concrete Overlay on Beulah Road Bridge: Condition of Overlay After One Year in Service
Authors: Michael M. Sprinkel, P.E.
A System for Forecasting and Monitoring Cash Flow: Phase I: Forecasting Payments on Construction Contracts
Authors: Adele Shapanka, Gary R. Allen, Ph.D.
Centerline Pavement Markings on Two-lane Mountain Highways: Volume 2
Authors: Mitsuru Saito, Nicholas J. Garber, Ph.D.
Centerline Pavement Markings on Two-lane Mountain Highways: Volume 1
Authors: Mitsuru Saito, Nicholas J. Garber, Ph.D.
Use of Interactive Graphics in Bridge Analysis and Design
Authors: Furman W. Barton, Ph.D., H. Celik Ozyildirim, Ph.D., P.E.
Bias of Air Void System Data from Fly Ash Concretes
Authors: Hollis N. Walker
Interim Report: A Non-Overlay Cathodic Protection System
Authors: G. G. Clemeña
Last updated: March 27, 2026
