Published in 1983
This interim report describes Virginia's experience in installing its first cathodic protection system for a bridge deck. The installation was completed with practically no problems. Very minor problems have been encountered with the rectifier/control unit. However, these problems haven't prevented the system from functioning as designed.
Last updated: January 17, 2024