Experimental Study of an Integral Bridge with Geofoam

Project No: 54168

Target Completion Date: April 28, 2005 Pavements

About the project:

The purpose of this study is to evaluate the long-term performance of an integral bridge equipped with Geofoam at the backwall-soil interface. An elastic material applied at the back of an integral backwall will be used to accommodate cyclic movement to minimize settlement at the approaches. It is envisioned that the results of this study will be generally applicable to steel girder integral backwall bridges. An assessment of current VDOT design guidelines will be made.

Project Team

Principal Investigators

Last updated: July 5, 2023