Detail and System Development for Full Depth Precast Concrete Bridge Deck Panels

Project No: 71176

Target Completion Date: June 30, 2007 Pavements

About the project:

The project objective is to develop comprehensive design and construction recommendations for a full-width, full-depth prestressed concrete bridge deck panel system. The system has many advantages over conventional cast in place decks, however, further refinement of the system is required to ensure constructable and serviceable bridge decks.

Project Team

Project Manager

Other Investigators

  • Carin L. Roberts-Wollmann - PI

Last updated: July 5, 2023