Detail and System Development for Full Depth Precast Concrete Bridge Deck Panels
Project No: 71176
Target Completion Date: June 30, 2007 Pavements
About the project:
The project objective is to develop comprehensive design and construction recommendations for a full-width, full-depth prestressed concrete bridge deck panel system. The system has many advantages over conventional cast in place decks, however, further refinement of the system is required to ensure constructable and serviceable bridge decks.