Skip to main content

Search All Reports

Quantitative Determination of Asphalt Antistripping Additive

Report No
05-R3
Publication date
2004

Authors: G. W. Maupin, Jr., P.E.

Appliqués for the Maintenance of Lead-based Painted Bridges: A Laboratory Assessment of Field-performance Characteristics

Report No
05-R4
Publication date
2004

Authors: S. R. Taylor, Christopher R. Standridge, Michael M. Sprinkel, P.E.

Evaluation of the Late Merge Work Zone Traffic Control Strategy

Report No
05-R6
Publication date
2004

Authors: Andrew G. Beacher, Nicholas J. Garber, Ph.D., Michael D. Fontaine, Ph.D., P.E.

The Replace Repair Decision for Heavy Equipment

Report No
05-R8
Publication date
2004

Authors: Adam S. Hyde, James S. Gillespie

Testing of Selected Metallic Reinforcing Bars for Extending the Service Life of Concrete Bridges: Testing in Solutions

Report No
03-CR11
Publication date
2003

Authors: John R. Scully, Christopher A. Marks, Michael F. Hurley

Evaluation of Traffic Signal Timing Optimization Methods Using a Stochastic and Microscopic Simulation Program

Report No
03-CR12
Publication date
2003

Authors: Byungkyu Park, J. D. Schneeberger

Health Monitoring of Post-Tension Tendons in Bridges

Report No
03-CR13
Publication date
2003

Authors: John C. Duke

Last updated: February 20, 2026

Please note that this file is not ADA compliant. Choose one of below options: