Ruggedness Study of Specimen Preparation and Fine-Tuning of Test Methods for IDT-CT and IDT-HT
Project No: 124496
Target Completion Date: June 30, 2025 Pavements
About the project:
The objective of this study is to conduct a ruggedness study on key factors that necessitate stricter control and more comprehensive guidelines during the specimen preparation of mixtures for the indirect tensile cracking test(IDT-CT) and indirect tensile at high temperature (IDT-HT) test. This will result in recommending unified and improved best practices, with a specific focus on specimen preparation, resulting in fine-tuning of the test methods, as the Virginia Department of Transportation (VDOT) is moving forward with the implementation of the Balanced Mix Design (BMD) concept.
Project Team
Principal Investigators
Co-Principal Investigators
Project Monitor
Other Investigators
- Nathan Moore, Adam Taylor
Last updated: October 29, 2023