Investigation of Some Issues Related to Electrochemical Chloride Extraction from Reinforced Concrete

Project No: 73188

Target Completion Date: January 5, 2006 Structures

About the project:

The purpose of this study is to develop a set of procedures for estimating the optimum electrochemical chloride extraction treatment time for a concrete structure, prior to treatment, and to develop a model with whicht he expected beneficial life and, therefore, the life cycle cost of the treatment of the structure can be estimated.