Roughness of Overlays on Bridge Approaches as Affected by Pavement Milling

Report No: 84-R39

Published in 1984

About the report:

Evaluation was made of the effectiveness of milling old asphaltic concrete surfaces for a short distance at bridge approaches in preparation for resurfacings. The results showed that such preparatory milling is highly effective in maintaining or improving pavement ride quality in the approach area. While geometrics or other considerations might preclude its use, the milling method is recommended for consideration as a procedure for preparing bridge approach areas for the placement of overlays.

Disclaimer Statement:The contents of this report reflect the views of the author(s), who is responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the Virginia Department of Transportation, the Commonwealth Transportation Board, or the Federal Highway Administration. This report does not constitute a standard, specification, or regulation. Any inclusion of manufacturer names, trade names, or trademarks is for identification purposes only and is not to be considered an endorsement.

Authors

  • R. W. Gunn, Kenneth H. McGhee

Last updated: January 17, 2024

Alert Icon

Please note that this file is not ADA compliant. Choose one of below options: