Published in 1977
This report describes a project in which approximately 6,200 tons (5,630 Mg) of asphaltic concrete were recycled through a conventional asphalt batch plant. During the construction of the project, a buildup of asphalt-coated fines occurred in the dryer and the dust collector. The buildup is thought to have been associated with the fineness and/or the high asphalt content of the recycled mix. To solve the problem, a change was made in the recycling process. The project was completed using a heat transfer method with mix proportions as high as 50% recycled material added to 50% virgin aggregate.
Last updated: January 27, 2024