A Study of the Morphology and Sediment Conditions of Ponds Prior to Upstream Highway Construction
Report No: 72-R43
Published in 1973
About the report:
This project involved the development of a scheme for determining whether or not a pond has been affected by upstream highway construction, and if so, to what degree. The project was a "before" phase of a larger study which will investigate the parameters influencing pond siltation. Seven ponds located in the three major physiographic regions of Virginia were studied. The soils in each region are different, as are their erosion and sediment potential.
- 72-R43
Documents
Disclaimer Statement:The contents of this report reflect the views of the author(s), who is responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the Virginia Department of Transportation, the Commonwealth Transportation Board, or the Federal Highway Administration. This report does not constitute a standard, specification, or regulation. Any inclusion of manufacturer names, trade names, or trademarks is for identification purposes only and is not to be considered an endorsement.
Authors
Last updated: February 8, 2024