Skip to main content

Search All Reports

Field Instrumentation and Measured Response of the I-295 Cable-stayed Bridge: Interim Report on Construction Period Strains in Cable Stays

Report No
91-IR1
Publication date
1991

Authors: Thomas Thaxton Baber, Wallace T. McKeel, Jr., P.E., Furman W. Barton, Ph.D.

Field Instrumentation and Measured Response of the I-295 Cable-stayed Bridge: Interim Report on Construction Measurements in Deck Segments

Report No
91-IR2
Publication date
1991

Authors: Thomas Thaxton Baber, Furman W. Barton, Ph.D., Wallace T. McKeel, Jr., P.E.

Evaluation of Novophalt as an Additive in Asphalt

Report No
91-IR6
Publication date
1991

Authors: G. W. Maupin, Jr., P.E.

Installation and Early Performance of a Field Test Section of Asphalt Rubber Concrete

Report No
92-IR1
Publication date
1991

Authors: G. W. Maupin, Jr., P.E.

Developing Design Elements for Scenic Byways in Virginia: Final Report

Report No
91-R1
Publication date
1991

Authors: Bradbury Purinton, Michael A. Perfater, Lester A. Hoel, Ph.D.

Pressurized Storm Sewer Simulation: Model Enhancement

Report No
91-R11
Publication date
1991

Authors: Shaw L. Yu, Yin Wu, Michelle Woolfolk

Last updated: February 20, 2026

Please note that this file is not ADA compliant. Choose one of below options: