Signal Timing Optimization: A Review of State Programs
Report No: 88-R22
Published in 1988
About the report:
In early 1988 the Virginia Department of Transportation (VDOT) was awarded a grant of $3.8 million from the Exxon oil overcharge refund to implement a statewide signal timing optimization program. A limited survey of signal timing programs in other states was undertaken to assist the VDOT in decisions regarding the design of its program. The findings from that survey are reported in this document.
- 88-R22
Documents
Disclaimer Statement:The contents of this report reflect the views of the author(s), who is responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the Virginia Department of Transportation, the Commonwealth Transportation Board, or the Federal Highway Administration. This report does not constitute a standard, specification, or regulation. Any inclusion of manufacturer names, trade names, or trademarks is for identification purposes only and is not to be considered an endorsement.
Authors
Last updated: December 29, 2023